SCADA System Integration


Supervisory Control And Data Acquisition is a bundling of software programs and hardware components used for process control and the gathering of data in real time from various locations in order to control equipment conditions. CSI uses SCADA in Water and Waste Water Control.

The controlled allows for effective optimization of the process and energy consumption, better overview, quick transmission of alarms, flexible control, and quick and easy reporting.

The major components of SCADA system are:

PC's: Personal Computers which run operator interface software. PC's provide a graphical view of the process to the operator, which enables him to monitor and control the process. Computers display historical data for analysis at any time.

PLC's: Programmable logic controllers that run a ladder logic program. They control the outputs based on the inputs being monitored, in the desired sequence. The PLC also communicates with other PLC's and/or computers.

Radio or Telephone Modems: Which are used to communicate from the plant to the remote site. This system is more reliable and faster than the old telemetry system.

RTU's: Remote Telemetry Units are rugged industrial computers that provide intelligence in the field and allows the Central SCADA master to Communicate with the field instruments. It is a standalone data acquisition and control unit. Its function is to control process equipment at the remote site, acquire data from the equipment, and transfer data back to the central SCADA System.

Provided below are some of our sample SCADA system screens:

Waste Water Treatment Plant Overview



Influent LiftStation



WWTP Head Works



Aeration



Clarification



RAS/WAS Pumps



Digesters



Trends



Alarm Management



Lift Station Summary



Elevated Tanks



Well-Ground Storage Tank-Service Pumps-Elevated Tank



Well Screens